PlannerPlan Machine Assignments

Plan Machine Assignments

Place work onto machine queues, arrange future assignments, and review the schedule for overlaps.

Goal

Turn unassigned work into machine queues or shared hall pools and review how future assignments fit across machines and time.

Before You Begin

  • Required access: Admin or Page Access assignment_planner, with relevant Machine Access.
  • Entry points: /assignment-planner

Begin on the Assignment Planner page.

Preconditions

  • Machines are available for planning.
  • Orders or operations already exist in the system.

Steps

Filter the visible hall or machine list

Select up to 25 machines and the halls whose pools you need. Pools do not count toward the machine limit. Narrow work with order tags, order and operation priorities, or the status of individual assignments.

Find the work

Open search with Ctrl+F (⌘F on a Mac) or the search icon in Filter & Sort. Search for an order, product, or customer. Choose Search in → Unassigned, Hall pools, Machines, or Everything. Esc or × clears and closes the search.

Choose a machine or hall pool

Drag the operation onto a machine column when its destination is known. If several machines in a hall could perform it, drag it into that hall's Hall Pool or assign a new operation there. Use the readiness badge to see when a machine can claim the pooled work.

For work without a connected sensor, choose a destination marked Work center. Review the destination before confirming; the work center shows orders without sensor KPIs.

Reorder work

Reorder work inside the queue to adjust the planned sequence. Enable Sort by Queue Position in the sort/filter options to display that manual order.

Update key details

Update key details such as status, dates, or priority when needed. Review or edit operation and assignment notes to keep instructions with the work.

Review the future schedule

Open Assignment Gantt and select up to 25 machines. Close the machine selection menu to apply your choices. Inspect the timeline for overlaps and open a related order when needed. Gantt has no hall-pool columns.

Arrange future assignments when needed

Open Improve plan, compare the alternatives, and review the assignments that would change before choosing Save as plan. Running and on-hold work keep their place. Follow the detailed comparison steps below.

Save the queue changes

Let the planner save the queue changes back to the platform.

Keep Hall Pools Beside the List

Choose the placement

On a wide screen, open Hall pools → Where to show them → Beside the list. Your choice is saved for your account. Choose In the board to return pools to the machines’ layout.

Choose the halls

Under Which pools to show, tick the halls you need. This also changes the hall filter. Each pool appears beside Unassigned operations and stays in view while you scroll through the machines. If the list is hidden, pools start at the left edge.

Make room and place work

Use Collapse pool to leave a narrow strip. If your search covers the pool, close it first so the work lands at the very end. Otherwise, a drop on the strip can land among the cards. Unassigned does not filter pools. You can drop onto the strip even while it is collapsed. Started work opens the handover dialog; after confirmation, its remainder goes to the top. Click the strip or use Expand pool to see its cards again. This browser remembers collapsed pools for the current company.

Search the List, Pools, or Machines

Open search

Press Ctrl+F (⌘F on a Mac) or select the search icon in Filter & Sort, even when the unassigned list is hidden. Enter an order, product, or customer.

Choose where to search

Under Search in, choose Unassigned for the list, Hall pools for pooled work, Machines for work on machines, or Everything for all three. Other areas keep showing their cards. The default is Unassigned, and your choice is remembered. Machines does not search machine names.

Review the matches and clear search

If a queue has more than 40 matches, use Show 40 more, or the smaller remaining number, to reveal more. When the search includes the unassigned list, check its found count. Press Esc or × to close and clear search; other filters remain in effect.

A link with a search uses Everything for that visit without replacing your saved choice.

Move Work to Another Queue

Choose an assignment that has not started

Find the card in its machine or hall-pool column. For pooled work, check the readiness badge before choosing the machine that will take it.

Drag the card to its destination

Drag it directly onto the destination machine or hall-pool column. You do not need to unassign it first.

Choose its queue position

Choose the start or end of the destination queue and review the resulting plan.

Started, stopped work uses the handover steps below. Running work must stop first. Finished and cancelled work cannot change destination.

Hand Over Started Work to Another Queue

Administrators and users with access to the Orders page can choose any hall pool or another machine they can access. Every user needs access to the step’s current machine. Other users can only return the step to the pool of its current machine’s hall, in Assignment Planner or Data Acquisition. The step must have started and then stopped. Finished or cancelled steps cannot be handed over.

Check that the work is stopped

A running card stays locked with Running. Stop it on the machine before moving it. Use the normal stop action in Data Acquisition and record the quantities first.

Drag the stopped step to its destination

Drop the card on a hall-pool or another machine column. The handover dialog opens even if started work is marked Planned or Released. Moving within the same column only reorders the queue.

Review quantities and pass on the reason

Check Planned, Done here, and Left. Review Quantity left: only good parts reduce the suggested remainder. Change it if parts need to be made again, or leave it empty if unknown. If nothing is left, finish the step unless more parts are needed. Add Reason (optional) for the next operator.

Confirm and review the queues

Check the destination, then choose Back to pool or Move for a machine. There is no automatic undo for a handover. The original machine keeps its times and good parts, marked Handed over. The rest goes to the top of the destination queue, even when dropped onto a collapsed pool. Both queues update. The step remains open until the remainder is finished.

For example, if 40 of 100 planned parts are good, the original machine keeps 40 and the next machine receives 60. Hover over a grey badge to check the destination or source and any reason. If the step changed during review, inspect the refreshed queues before trying again.

Set an Operation Priority and Filter the Plan

Choose the priority to change

On an operation or queue card, select the dashed OP chip to set Operation priority. Use P to change Order priority instead. The two values are independent.

Choose matching priorities

Use Order priority and Operation priority to select one or more values. Type a number if it is absent from the legend. With both filters set, work must match both in the unassigned panel and machine columns.

Check the remaining filters

If work disappears, review the status, tags, and machines. For missing work in the unassigned list, also check the import filter. It narrows only that list to one ERP upload. Remove any unwanted order, product, or customer filter chip above the board. Open the information icon for Assignment Planner Guide for help.

Sort and Highlight Planning Cards

Choose manual order or sorting rules

In the sort/filter options, enable Sort by Queue Position to use the order set by dragging assignments. Turn it off to sort by fields such as priority or date.

Set rule precedence

Choose Operation Planned Start or Operation Planned End to sequence individual steps. Choose Order Planned Start or Order Planned End to keep an order’s steps together. Set ascending or descending order. Add rules to break ties and drag them into the order of precedence.

Emphasize the details you need

Open Highlight and select fields from Order, Work Order, Product, Operation, Planning, and Assignment. Check the cards for your selected highlights, such as priority, due date, or customer.

Sort a Queue by Priority and Date

You need access to the Planner and the machine, plus an administrator account or a user account with access to the Orders page. Operators cannot use this action. The machine or hall pool must already contain work.

Open the queue preview

Under Filter & Sort, enable Sort by Queue Position. In the machine or hall-pool header, choose Sort by priority and date. The preview covers the active queue, including cards hidden by filters.

Choose the priority and review

Each opening starts with Order priority. Choose Operation priority to use step priorities instead. Higher priorities come first, then earlier planned operation starts. Check proposed positions and the previous positions of moved work. Running orders stay first, followed by on-hold orders; Stays on top marks these groups.

Apply or leave the order unchanged

Choose Apply order to save the shared sequence. Choose Cancel to keep the existing order. If the queue changed during review, check the updated proposal before applying. If loading fails, retry; applying remains unavailable until loading succeeds. If no positions change, there is nothing to apply.

Check or undo the result

Check the queue after New order applied. Select Undo in that confirmation to restore the previous order. If undo fails, review the reloaded queue before adjusting it. You can still drag cards to change the sequence. New imports join the end; this action does not keep sorting automatically.

With queue sorting on and no filters or relevant search, card numbers show the positions in each queue. Clear priority, operation priority and tag filters, restore the usual status selection, and clear search in that area if numbers are missing.

Save or Use Company Sorting

You need an administrator account to save the company default. Other users with access to the relevant screen can reset their own sorting to it.

Set and save the company choices

As an administrator, open Filter & Sort in Assignment Planner. Set the mode, sort rules, and Moves choice, then select Save as company default. Wait for Saved as company default.

Use the default in the Planner

If you have no personal sorting, you start with the company default. To replace personal sorting, use Reset to company default in the sort section. It saves the current company mode, rules, and Moves choice as your own settings. Without a company default, Reset to default (no company default set yet) restores the standard choices.

Use the default at the terminal

In Data Acquisition V3, open Card Display Settings → Sort Order → Reset to company sorting, then Save. The button shows a tick and is unavailable when the sorting already matches. Without a company default, use Reset to default (no company default set yet), then Save. Queue-mode choices for running and waiting orders remain unchanged; sort rules are replaced. Add any special running- or waiting-order rules again if needed. Follow the display setup steps.

A saved personal choice or reset does not follow later company-default changes. Reset again when you want to copy newer company choices.

Review Forecaster Warnings Before Changing the Plan

Check which date the warning refers to

Open Forecaster check in Assignment Planner and review the selected date. The card's coloured tab compares the job with this date: red means late, amber means at risk, and green means on time.

Read the explanation

Choose How does the Forecaster work? at the bottom of the menu. This opens the help without changing your selected date check. Read what the colours mean and when times may be too early, then close the help to return to planning.

Review the expected times

Open Assignment Gantt. In the view options, choose Expected times to include delays or Planned dates to inspect the plan. Open Attention to review the most important warnings first. Follow the related order to check steps without a machine or date. Also check planned durations, machine shifts, and whether current work has been recorded on the PDA/BDE.

Decide whether to change the plan

Reading the forecast changes nothing. If you want to compare waiting-job sequences, open Improve plan. Review the comparison before choosing Save as plan. Saving changes planned dates and queues, can be undone, and never changes delivery dates.

If the Forecaster has no expected end, the Planner only compares the job's date with today. If expected times are unavailable in Assignment Gantt, you see planned times without delays while the Forecaster tries again. Neither view confirms that delivery will be on time.

Find Late Orders and Plan Missing Steps

Find the orders needing work

With access to Orders & Products, open Forecaster. Choose Late for delivery → Show in table or Of these, steps not planned → Show in table. Date range and status filters pause; order, product, customer, and machine filters still apply.

Find orders absent from the board

Choose Not planned at all → Show list. Open an order and select Assign steps or Open in planner. These orders have a delivery date but no operation on a machine or in a hall pool.

Assign the missing earlier step

In Assignment Gantt, inspect Attention → Earlier step not planned. Follow Show that step, then Assign to a machine when available. Select a machine you may plan on. A step waiting in a hall pool needs a machine too.

Check dates and the new forecast

The assignment uses the step’s own planned dates. If no planned start exists, set dates before treating it as planned. Review the recalculated times for later steps and check whether the order still risks missing delivery.

Compare and Save a Plan

Choose the machines and compare

Open Improve plan in Assignment Gantt. Compare Today with the other orderings for the machines on the board. Check Deliveries at risk, Total lateness, and the list of assignments that would move.

Separate the preview from the saving result

Use Show on board to preview an alternative without saving. Read what saving would actually do: running, on-hold, and blocked assignments keep their place. If saving would worsen delivery, return with Back to today and review missing planning steps instead.

Review and save

Choose Save as plan and review the changed queue places and dates, the effect on orders, and Left as they are. Confirm only the intended changes. Delivery dates and the plant’s ordering rule stay unchanged. If someone changed the plan during review, nothing is saved; check the reloaded board again.

Check the result

Check the board and Assignment Planner for the new queue and Watchmen dates. Use Undo to return to the previous plan if needed.

Move One Assignment After Checking Its Effect

Choose the move

Open an assignment in Assignment Gantt. Select Move → Earlier, Later, Run next, or To machine…. Read the explanation if the action is unavailable. Running, on-hold, and finished work stays in place. Recorded work prevents a machine change.

Review other work before saving

Check the expected start and end, other assignments pushed later, and changes to late orders. Save after reviewing the assignments that will be replanned on the machine.

Check or undo the move

Review the updated queue. Use Undo if needed. If someone has changed the queue since, automatic undo is unavailable; review it and move the assignment back by hand.

Set the Plant’s Forecast Rule

Administrators open Planning settings → Planning in Assignment Gantt. Choose How does your plant decide what runs next? and review the ordering choices. Set Hold limit (working hours) between 1 minute and 720 hours, then save. Confirm the displayed forecast rule. Other users can compare alternatives without changing this company setting.

Only working time counts toward the hold limit. Without planned shifts, 24 hours count as the full limit. Once exceeded, paused work stops holding the machine in the forecast and work behind it moves up.

Review Conflicts After an Order Import

When Order Upload flags a conflict for manual resolution, use the order and operation details in the import summary to find the affected work in the planner. Review its current destination, status, notes, and related order before changing the plan.

Move an eligible assignment to the intended queue when appropriate. If work has started, review its recorded quantities and stop it before handing over the remainder. Finished work stays on its machine. The import summary explains when a decision could not be applied because production changed after review.

Check Move Eligibility and Queue Changes

Unstarted planned or released work moves directly. Started, stopped work opens the handover dialog. Running work must stop first, and finished or cancelled work stays on its machine. Up to 25 machines can be shown; hall pools do not count toward that limit.

For moves without a dialog, with Queue Position enabled, running and on-hold assignments stay at the top and a drop sets the exact position. With it disabled, sorting rules control the view and Moves chooses the start/end destination. If another change refreshes the queue while you reorder, redo the reorder against the refreshed queue.

Use Assignment Gantt to inspect the timeline. Its drag-to-reschedule mode is Experimental and read-only; use supported planner controls for changes.

Use the view switch to open Assignment Gantt for a timeline review. Use its Move controls for eligible work or return to Assignment Planner to work with queues.

Decision Points

  • Whether to hand over stopped work to a hall pool or directly to another machine.
  • Whether to keep pools beside the list or within the board.
  • Whether to search only the list, pools, machines, or all three.
  • Whether to choose a specific machine now or leave the work in a hall pool.
  • Whether a job should stay unassigned, move to another machine, or be removed from a queue.
  • Which machines should appear in the Gantt timeline.
  • Whether overlap warnings should be resolved manually or through automatic arrangement of future assignments.
  • Whether expected times include all steps, durations, and shifts before you rely on them.
  • Whether to save a compared plan or leave the existing plan unchanged.

Expected Result

The machine queue reflects the latest planning decision, future assignments follow the accepted arrangement, and active production remains unchanged.

Common Problems and Edge Cases

  • You can show up to 25 machines plus hall pools. Gantt shows up to 25 machines without pool columns.
  • If no pool appears, tick a hall under Hall pools → Which pools to show. Use a wider screen if the placement menu is unavailable.
  • If a queue shows only 40 cards, use Show 40 more, or the smaller remaining number. The count and summary include every card in the queue, also the ones not shown yet.
  • A hall pool loads up to 500 assignments; a machine queue loads up to 100. With Queue Position on, dropping an unassigned operation into a large queue adds the work but does not save its chosen position. This affects hall pools with more than 500 active assignments and machine queues with more than 100. The Planner shows Could not persist queue reorder. Local changes were rolled back. and reloads the queue. Check the queue before trying again. Reordering work already in a large pool is still saved.
  • If a change cannot be saved, the Planner shows an error and reloads the queues involved. Check them before trying again.
  • If filters hide all machines, the planner shows an empty planning surface.
  • Removing an assignment sends the work back out of the planned queue rather than completing it.
  • If your search covers a queue, close it before dropping at the end so work lands at the very end. Otherwise, the drop can land among its cards. Unassigned leaves machine queues and pools unfiltered.
  • If a dragged order does not match the displayed order, check whether Sort by Queue Position is enabled or sorting rules are active.
  • Running work must stop before handover. Finished and cancelled work stays on its machine.
  • Review the actual saving result in Improve plan. A preview can look better than the result that can be saved because some work must keep its place.
  • Times may be too early: review missing machines or dates, planned durations, shift plans, and current production entries before relying on the finish.
  • Warning counts differ between pages: Assignment Gantt covers the displayed machines from last week to three weeks ahead; Orders & Products counts late deliveries across the company.